top of page
Blue Background

Resources - Learning Center & Blog

St. Louis Medical Device Suppliers: UDI, Lot Traceability and Quality Records in Dynamics 365

Writer: Michael Hornberger
Michael Hornberger
2 days ago
4 min read

Medical device manufacturers, distributors and contract suppliers need to trace every lot or serial number from supplier to customer, quickly and with records an auditor will accept. Dynamics 365 Business Central supports lot and serial tracking and trace reports natively, and it can store device identifiers on items. Quality management, document control and regulatory submissions typically require an extension or a separate quality system alongside the ERP.


Why does traceability matter so much for medical device companies?

Because when a product problem occurs, speed and accuracy decide the outcome. If a component lot proves defective, you need to identify every finished product that used it and every customer who received those products, and you need to do it in hours. Regulators expect these records to exist and to be reliable. A trace that takes three days of spreadsheet matching is a business risk even if the answer is right.


The St. Louis region has a strong life sciences community, from companies in and around the Cortex innovation district to contract manufacturers and distributors serving hospitals and clinics across Missouri and Illinois. Many of them are small enough to run on QuickBooks, Dynamics GP or a patchwork of tools, and large enough that a single recall would hurt.


What is a unique device identifier, and how does the ERP use it?

A unique device identifier, or UDI, is a code that identifies a medical device and, depending on the device, its production details such as lot number, serial number and expiration date. It generally has a device identifier portion that is fixed for a product and a production identifier portion that varies with each lot or unit.


In an ERP, you store the device identifier on the item, use lot or serial tracking for the production identifiers, and print labels that include the required data. The system itself does not make a device compliant, and requirements depend on the device class, so work with your regulatory lead on what applies to you.


What does Business Central do for lot and serial tracking?

Business Central lets you define item tracking codes that control whether an item is tracked by lot, serial number or both, and whether expiration dates are required. Tracking information is captured at receipt, carried through inventory movements and production, and recorded again at shipment. From there, the item tracing function lets you search by lot or serial and follow it forward or backward through the supply chain.


That covers the core trace question. It also supports lot attributes, expiration date handling and blocking a lot so it cannot be sold or consumed while it is under investigation.


What does the ERP not cover on its own?

  • Quality management. Nonconformance reports, corrective and preventive actions, audits and supplier quality scorecards usually need a dedicated quality system or an extension.

  • Document control. Controlled procedures, work instructions and training records often live in a separate document management tool.

  • Design history and device master records. Many companies keep these in a product lifecycle or quality tool, with the ERP holding the item and bill of materials.

  • Regulatory submissions. Registration, reporting and UDI database submissions are handled outside the ERP.

  • Electronic signature requirements. If your records fall under electronic record rules, confirm how approvals are captured and retained.


How do you test a trace before an auditor does?

Run a mock recall. It takes a few hours and shows you where the process is weak.

  1. Pick a finished product lot at random from six months ago.

  2. Trace it backward to every component lot and supplier.

  3. Trace one component lot forward to every finished lot and every customer shipment.

  4. Compare the quantities to what is on hand, consumed and shipped.

  5. Time the exercise and write down every manual step.


If the result relies on someone's memory or a side spreadsheet, that is the gap to fix first. A good target is a complete forward and backward trace in under an hour.


What should you ask a partner about your industry?

Ask for examples of lot-controlled implementations, how they handle expiration and quarantine, how labels are produced, and which quality tools they have connected to Dynamics 365. Make sure the partner understands that your auditor, not your software vendor, defines what counts as compliant.


How should you handle supplier quality records?

Treat suppliers as part of your traceability chain. Record the supplier lot number at receipt, keep certificates of conformance linked to the receiving record, and use blocking to hold material until incoming inspection is complete. Many device companies also track approved supplier status and expiration of qualifications in a separate quality tool, then connect it to the ERP so purchasing cannot order from a supplier whose qualification has lapsed. Decide early where each of these records lives, so there is one place to look during an audit.


Turnkey Technologies has been implementing Dynamics for more than 30 years and is based in Chesterfield, close to the region's life sciences companies. Our ERP implementation and support services include item tracking design, labeling and integration with quality tools.


You can see how we work with device makers on our medical device manufacturing page.

To see whether Business Central or a larger Dynamics 365 system fits your product and compliance needs, start with the Dynamics 365 Suitability Assessment. You can also call (636) 777-4110.

 
 
bottom of page